The following documents are available for this project and can be downloaded below:Industrial EPC

1. Summary of photographs

2. Summary of images of the building being modelled for energy certification

3. Lodged Energy Performance Certificate

4. An overview report for the EPC and Action Plan. When the EPC was carried out an Action Plan was discovered to be required as the buidling didn't quite meet the equivalent of the 2002 building regulations. 

5. A copy of the lodged Section 63 Action Plan.  

6. A copy of the lodged Display Energy Certificate (DEC). The next DEC, recording the actual energy use requires to be lodged within 12 months of this DEC. This process should begin approximately 8 weeks prior to the expiry of the DEC. 

CLICK HERE FOR THE DOCUMENTS:  folder Glasgow, High Craighall, 100

For more information contact Ewan Paterson of Metro Commercial on 07968 808 808.